Govind Development, LLC (GDL) served as the prime consultant for this project providing civil, structural and marine engineering, design, and construction services. The project consisted of the construction of a cantilevered and an anchored steel sheet piling bulkhead encapsulating existing steel sheet piling bulkhead, two (2) 4-pile breasting structures, dock basin dredging, dock house, a road section and built up grade civil work, sewage system, non-potable water line, a dry fire protection system, electrical systems for area lighting, power supply to miscellaneous equipment such as air conditioning unit and sewer system pumps, and security fencing with relocated swing gates. In addition, the project also included the demolition of an existing metal building with concrete foundation, existing security fence system, existing mooring bollards, and existing timber fenders.
GDL provided the project design drawings and specifications, performed construction administration, and project inspection.