Govind Development, LLC (GDL) served as the prime consultant for this project furnishing civil, structural and marine engineering, design, and construction inspection services. This project comprised of increasing the functionality of Citgo Dock 3 due to the existing mooring hooks reaching the end of their functional life and no existing cleats for barges to moor against the dock. GDL services included engineering for the installation of mooring cleats on the lower level of the dock to allow barges to use the facility and the mooring hooks were replaced with fixed mooring bollards.
GDL provided the project design drawings and specifications, performed construction administration, and inspection services.